Other options to evaluate

Alternatives to Hetzner

Hetzner alternatives differ in regions, APIs, managed services, support and network pricing. Start from a defined workload and recovery design instead of comparing only the smallest virtual-machine price.

Migration starts with requirements

Before changing tools

Model compute, storage, backups, outbound traffic and support together. Confirm current regions, service limits and contractual terms directly with each provider before migration.

Regions and failure domainsCompute, storage and managed servicesAPI and infrastructure-as-code coverageNetwork traffic, backups and support

Use the profile fields below as a starting point, then confirm current capabilities, migration paths, licensing and pricing in the official documentation.

Production decision record

Test the change before committing

Migration and rollback

Inventory data, configuration, identities and integrations. Time a representative export, import and rollback before choosing a cutover plan.

Security and operations

Compare access controls, audit logs, update ownership, backup recovery, observability and the work required during an incident.

Total cost

Model licenses, infrastructure, data transfer, support and operator time at production scale. Record plan limits and renewal assumptions.

Read the evaluation methodology · Report a correction

Why these options are different

Technical shortlist

Keep the current option in the proof of concept

A replacement decision should use the same workloads, failure tests and cost assumptions for every candidate.

Review the Hetzner profile →Compare these tools →